Pole Barn & Metal Building Pads
Picayune, MS · Southern Mississippi

Pole Barn & Metal Building Pads

A level pad. A solid start.

What It Involves

Before a pole barn, metal building, or shed goes up, the pad has to be right. HKS clears, grades, and compacts a level pad so your building sits on solid ground and doesn't settle or shift over time.

Problems We Solve

  • Uneven ground where you want to put a building
  • A site that needs clearing before a pad can be built
  • Soft or low ground that won't support a structure
  • A pad that needs to be level and compacted for construction

Equipment & Methods

  • Clearing the building footprint
  • Grading and leveling to a precise pad elevation
  • Compacting the base for a solid foundation

Benefits to You

  • A level, compacted pad ready for construction
  • Prevents settling and shifting under the building
  • Proper drainage away from the pad
  • One crew handles clearing through pad prep

Project Considerations

  • Pad size and elevation for your specific building
  • Soil conditions and whether fill or gravel base is needed
  • Drainage around the pad to prevent water pooling

Frequently Asked Questions

Do you build the building or just the pad?+

HKS prepares the pad — clearing, grading, and compacting the site so it's ready for your building crew. The pad is the foundation everything else depends on.

How big of a pad can you prep?+

From small shed pads to large pole barn and metal building footprints. Tell Hunter the dimensions and he'll grade it to spec.

Does the pad need gravel?+

Often yes — a compacted gravel base gives a solid, well-drained surface to build on. Hunter will recommend whether your site needs it.

Call Text