What It Involves
Before a pole barn, metal building, or shed goes up, the pad has to be right. HKS clears, grades, and compacts a level pad so your building sits on solid ground and doesn't settle or shift over time.
Problems We Solve
- Uneven ground where you want to put a building
- A site that needs clearing before a pad can be built
- Soft or low ground that won't support a structure
- A pad that needs to be level and compacted for construction
Equipment & Methods
- Clearing the building footprint
- Grading and leveling to a precise pad elevation
- Compacting the base for a solid foundation
Benefits to You
- A level, compacted pad ready for construction
- Prevents settling and shifting under the building
- Proper drainage away from the pad
- One crew handles clearing through pad prep
Project Considerations
- Pad size and elevation for your specific building
- Soil conditions and whether fill or gravel base is needed
- Drainage around the pad to prevent water pooling
Frequently Asked Questions
Do you build the building or just the pad?+
HKS prepares the pad — clearing, grading, and compacting the site so it's ready for your building crew. The pad is the foundation everything else depends on.
How big of a pad can you prep?+
From small shed pads to large pole barn and metal building footprints. Tell Hunter the dimensions and he'll grade it to spec.
Does the pad need gravel?+
Often yes — a compacted gravel base gives a solid, well-drained surface to build on. Hunter will recommend whether your site needs it.


